Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

Industrial Development Authority-Hillsville-Carroll Co., VA

East Tennessee Natural Gas · Loc 59224 · CARROLL, Virginia
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.001
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 25
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.002
Nov 20
30-day low
0.001
Nov 26
Operating capacity
0.001
Bcf/d as posted, late_0005 cycle
Utilization
83%
headroom 17%

Scheduled quantities as posted by East Tennessee Natural Gas on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0010.0010.0020.002Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.001-0.000
Nov 250.001+0.000
Nov 240.001+0.000
Nov 230.001+0.000
Nov 220.001+0.000
Nov 210.001-0.001
Nov 200.002+0.000
Nov 190.002+0.000
Nov 180.002+0.001
Nov 170.001+0.000
Nov 160.001+0.000
Nov 150.001+0.000
Nov 140.001+0.000
Nov 130.001+0.000
Nov 120.001+0.000
Nov 110.001+0.000
Nov 100.001+0.000
Nov 90.001+0.000
Nov 80.001+0.000
Nov 70.001+0.000
Nov 60.001+0.000
Nov 50.001-0.001
Nov 40.001+0.001
Nov 30.001+0.000
Nov 20.001+0.000
Nov 10.001-0.001
Oct 310.001+0.000
Oct 300.001+0.000
Oct 290.001+0.000
Oct 280.001—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
East Tennessee Natural GasIndustrial Development Authority-Hillsville-Carroll Co., VA

East Tennessee Natural GasPlaced at the center of Carroll, VA — approximate; the exact meter site is not published.

Recent notices on East Tennessee Natural Gas

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All East Tennessee Natural Gas notices →

East Tennessee Natural Gas · posted 2026-10-30 · effective 2026-10-16 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Industrial Development Authority-Hillsville-Carroll Co., VA (East Tennessee Natural Gas loc 59224) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/easttenn/59224/