Pascagoula PTR

Destin Pipeline · Loc 090003 · Mississippi
Processing plant · counted in Supply / Production
Gas day Nov 26
-0.157
Bcf/d scheduled
Δ Day-over-day
-0.007
vs Nov 25
7-day average
-0.141
Bcf/d
30-day average
-0.143
30 of 30 days posted
30-day high
-0.097
Nov 21
30-day low
-0.163
Nov 11

Scheduled quantities as posted by Destin Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.20-0.15-0.10-0.05-0.00Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.157-0.007
Nov 25-0.149-0.004
Nov 24-0.145-0.016
Nov 23-0.128+0.030
Nov 22-0.158-0.062
Nov 21-0.097+0.057
Nov 20-0.154-0.026
Nov 19-0.128+0.012
Nov 18-0.140+0.007
Nov 17-0.147+0.005
Nov 16-0.153+0.000
Nov 15-0.153+0.000
Nov 14-0.153-0.003
Nov 13-0.149-0.005
Nov 12-0.144+0.018
Nov 11-0.163-0.011
Nov 10-0.152-0.023
Nov 9-0.129-0.011
Nov 8-0.117+0.000
Nov 7-0.117+0.014
Nov 6-0.131+0.016
Nov 5-0.147+0.001
Nov 4-0.148+0.005
Nov 3-0.153-0.006
Nov 2-0.147-0.002
Nov 1-0.145+0.001
Oct 31-0.146+0.006
Oct 30-0.151+0.000
Oct 29-0.151-0.001
Oct 28-0.150—
46 more days on file for this meter, back to September 12, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Mississippi) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Destin Pipeline in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Pascagoula PTR (Destin Pipeline loc 090003) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/destin-pipeline/090003/