Gas day Nov 27
+0.875
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.875
Bcf/d
30-day average
+0.869
30 of 30 days posted
30-day high
+0.875
Nov 27
30-day low
+0.819
Oct 31
Operating capacity
1.800
Bcf/d as posted, evening cycle
Utilization
49%
headroom 51%
Scheduled quantities as posted by CPL on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | +0.875 | +0.000 |
| Nov 26 | +0.875 | +0.000 |
| Nov 25 | +0.875 | +0.000 |
| Nov 24 | +0.875 | +0.000 |
| Nov 23 | +0.875 | +0.000 |
| Nov 22 | +0.875 | +0.000 |
| Nov 21 | +0.875 | +0.000 |
| Nov 20 | +0.875 | +0.000 |
| Nov 19 | +0.875 | +0.000 |
| Nov 18 | +0.875 | +0.000 |
| Nov 17 | +0.875 | +0.000 |
| Nov 16 | +0.875 | +0.000 |
| Nov 15 | +0.875 | +0.000 |
| Nov 14 | +0.875 | +0.000 |
| Nov 13 | +0.875 | +0.000 |
| Nov 12 | +0.875 | +0.000 |
| Nov 11 | +0.875 | +0.000 |
| Nov 10 | +0.875 | +0.000 |
| Nov 9 | +0.875 | +0.000 |
| Nov 8 | +0.875 | +0.000 |
| Nov 7 | +0.875 | +0.000 |
| Nov 6 | +0.875 | +0.000 |
| Nov 5 | +0.875 | +0.000 |
| Nov 4 | +0.875 | +0.000 |
| Nov 3 | +0.875 | +0.000 |
| Nov 2 | +0.875 | +0.000 |
| Nov 1 | +0.875 | +0.056 |
| Oct 31 | +0.819 | +0.000 |
| Oct 30 | +0.819 | +0.000 |
| Oct 29 | +0.819 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Cove Point PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.
Notices
Recent notices on CPL
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All CPL notices →
SEV 4/5Cove Point Operational Alert
CPL · posted 2026-11-25 · effective 2026-11-25 · operational alert
CPL has reissued a Critical Operational Alert (PPO subcategory) for Cove Point LNG under new notice ID CPL-1012889, replacing the prior posting CPL-1012597 from 2026-11-10 with no change in operational content. No curtailment volume or restoration timeline is stated. Pre-event fe…
SEV 4/5Cove Point Operational Alert
CPL · posted 2026-11-10 · effective 2026-11-10 · operational alert
Cove Point LNG has issued a Critical Operational Alert (PPO subcategory) effective November 10, 2026. No specific capacity figures or curtailment volumes are stated in the notice text. Prior to the event, the Cove Point Plant delivery point was moving approximately 0.86 Bcf/d (D:…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Cite thisEnercast PipeScrape, CVP STORAGE POINT (CPL loc 10002) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/cpl/10002/