Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

CVP STORAGE POINT

CPL · Loc 10002 · Northeast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
+0.875
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.875
Bcf/d
30-day average
+0.869
30 of 30 days posted
30-day high
+0.875
Nov 27
30-day low
+0.819
Oct 31
Operating capacity
1.800
Bcf/d as posted, evening cycle
Utilization
49%
headroom 51%

Scheduled quantities as posted by CPL on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.000.250.500.751.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.875+0.000
Nov 26+0.875+0.000
Nov 25+0.875+0.000
Nov 24+0.875+0.000
Nov 23+0.875+0.000
Nov 22+0.875+0.000
Nov 21+0.875+0.000
Nov 20+0.875+0.000
Nov 19+0.875+0.000
Nov 18+0.875+0.000
Nov 17+0.875+0.000
Nov 16+0.875+0.000
Nov 15+0.875+0.000
Nov 14+0.875+0.000
Nov 13+0.875+0.000
Nov 12+0.875+0.000
Nov 11+0.875+0.000
Nov 10+0.875+0.000
Nov 9+0.875+0.000
Nov 8+0.875+0.000
Nov 7+0.875+0.000
Nov 6+0.875+0.000
Nov 5+0.875+0.000
Nov 4+0.875+0.000
Nov 3+0.875+0.000
Nov 2+0.875+0.000
Nov 1+0.875+0.056
Oct 31+0.819+0.000
Oct 30+0.819+0.000
Oct 29+0.819—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Cove Point Pipeline

Cove Point PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on CPL

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All CPL notices →

CPL · posted 2026-11-25 · effective 2026-11-25 · operational alert
CPL has reissued a Critical Operational Alert (PPO subcategory) for Cove Point LNG under new notice ID CPL-1012889, replacing the prior posting CPL-1012597 from 2026-11-10 with no change in operational content. No curtailment volume or restoration timeline is stated. Pre-event fe…
CPL · posted 2026-11-10 · effective 2026-11-10 · operational alert
Cove Point LNG has issued a Critical Operational Alert (PPO subcategory) effective November 10, 2026. No specific capacity figures or curtailment volumes are stated in the notice text. Prior to the event, the Cove Point Plant delivery point was moving approximately 0.86 Bcf/d (D:…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CVP STORAGE POINT (CPL loc 10002) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/cpl/10002/