Gas day Nov 26
0.858
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.859
Bcf/d
30-day average
0.851
30 of 30 days posted
30-day high
0.859
Nov 25
30-day low
0.804
Oct 31
Operating capacity
0.920
Bcf/d as posted, evening cycle
Utilization
93%
headroom 7%
Scheduled quantities as posted by CPL on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LNG Feedgas page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.858 | -0.001 |
| Nov 25 | 0.859 | +0.000 |
| Nov 24 | 0.859 | +0.000 |
| Nov 23 | 0.859 | +0.000 |
| Nov 22 | 0.859 | +0.000 |
| Nov 21 | 0.859 | +0.000 |
| Nov 20 | 0.859 | +0.000 |
| Nov 19 | 0.859 | +0.000 |
| Nov 18 | 0.859 | +0.000 |
| Nov 17 | 0.859 | +0.000 |
| Nov 16 | 0.859 | +0.000 |
| Nov 15 | 0.859 | +0.000 |
| Nov 14 | 0.859 | +0.000 |
| Nov 13 | 0.859 | +0.000 |
| Nov 12 | 0.859 | +0.000 |
| Nov 11 | 0.859 | +0.000 |
| Nov 10 | 0.859 | +0.000 |
| Nov 9 | 0.859 | +0.000 |
| Nov 8 | 0.859 | +0.000 |
| Nov 7 | 0.859 | +0.000 |
| Nov 6 | 0.859 | +0.000 |
| Nov 5 | 0.859 | +0.000 |
| Nov 4 | 0.859 | +0.000 |
| Nov 3 | 0.859 | +0.000 |
| Nov 2 | 0.859 | +0.000 |
| Nov 1 | 0.859 | +0.055 |
| Oct 31 | 0.804 | +0.000 |
| Oct 30 | 0.804 | +0.000 |
| Oct 29 | 0.804 | +0.000 |
| Oct 28 | 0.804 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Cove Point PipelinePlaced at the Cove Point LNG terminal; approximate. The meter itself sits on the feed-gas line into the terminal.
Notices
Matched to this meter
Enercast’s scorer tied these notices to this exact posted point.
SEV 4/5Cove Point Operational Alert
CPL · posted 2026-11-25 · effective 2026-11-25 · operational alert
CPL has reissued a Critical Operational Alert (PPO subcategory) for Cove Point LNG under new notice ID CPL-1012889, replacing the prior posting CPL-1012597 from 2026-11-10 with no change in operational content. No curtailment volume or restoration timeline is stated. Pre-event fe…
SEV 4/5Cove Point Operational Alert
CPL · posted 2026-11-10 · effective 2026-11-10 · operational alert
Cove Point LNG has issued a Critical Operational Alert (PPO subcategory) effective November 10, 2026. No specific capacity figures or curtailment volumes are stated in the notice text. Prior to the event, the Cove Point Plant delivery point was moving approximately 0.86 Bcf/d (D:…
CPL · posted 2026-10-12 · effective 2026-10-12 · maintenance
Cove Point LNG liquefaction terminal maintenance has been completed as of October 12, 2026. The notice is a restoration/completion advisory rather than a new constraint -- it signals a return to normal feedgas operations. Live capacity data shows COVE POINT PLANT (D:DPQ) at 87.4%…
CPL · posted 2026-10-06 · effective 2026-10-07 · restoration
Cove Point LNG is terminating a previously active capacity restriction (PPO) effective 2026-10-07 at 03:00. This restoration notice signals that prior feedgas delivery constraints at Cove Point are being lifted, restoring normal LNG export operations. No specific capacity figure …
CPL · posted 2026-09-26 · effective 2026-09-26 · capacity constraint
Cove Point LNG (CPL) has posted a critical capacity constraint notice effective 2026-09-26 at 23:00, classified as a PPO (Periodic Pressure Obligation) restriction. No specific volume impact is stated in the notice text. Live capacity data shows COVE POINT PLANT (SI:SIQ) at only …
CPL · posted 2026-09-24 · effective 2026-09-24 · capacity constraint
Cove Point LNG (CPL) has posted a Critical capacity constraint notice titled 'Cove Point Restrictions Update' effective 2026-09-24, classified as a PPO (Planned Partial Outage) under the pipeline's own notice taxonomy. No specific capacity volume or duration is stated in the noti…
CPL · posted 2026-09-18 · effective 2026-09-19 · maintenance
Cove Point LNG is entering its annual planned maintenance outage effective 2026-09-19 at 14:00. The notice is classified as a Capacity Constraint / Critical notice by the operator but provides no specific duration or volume impact. As an LNG export terminal, any feedgas curtailme…
SEV 4/5Cove Point Restrictions
CPL · posted 2026-09-16 · effective 2026-09-19 · capacity constraint
Cove Point LNG (CPL) has posted a Critical capacity constraint notice effective 2026-09-19 at 14:00, classified as a PPO (Planned Partial Outage). No specific capacity reduction volume is stated in the notice text. Live EBB data as of the 2026-09-16 evening cycle shows COVE POINT…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Cite thisEnercast PipeScrape, Cove Point -- CPL Plant delivery (CPL loc 10001) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/cpl/10001/