Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

Giant Cement Company

Carolina Gas Transmission · Loc 26223 · DORCHESTER, South Carolina
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.003
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.006
Nov 1
30-day low
0.001
Nov 5
Operating capacity
0.013
Bcf/d as posted, evening cycle
Utilization
13%
headroom 87%

Scheduled quantities as posted by Carolina Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0020.0040.006Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.002+0.000
Nov 250.002+0.000
Nov 240.002-0.002
Nov 230.003+0.000
Nov 220.003+0.000
Nov 210.003+0.000
Nov 200.003+0.000
Nov 190.003+0.000
Nov 180.003+0.000
Nov 170.003+0.000
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003+0.000
Nov 130.003+0.001
Nov 120.002-0.000
Nov 110.003+0.000
Nov 100.003+0.000
Nov 90.003+0.000
Nov 80.003+0.000
Nov 70.003+0.000
Nov 60.003+0.002
Nov 50.001-0.002
Nov 40.003+0.000
Nov 30.003+0.000
Nov 20.003-0.003
Nov 10.006+0.004
Oct 310.002+0.000
Oct 300.002-0.000
Oct 290.003+0.001
Oct 280.002—
46 more days on file for this meter, back to September 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Giant Cement Company

Placed at the center of Dorchester, SC — approximate; the exact meter site is not published.

No recent notices matched or named this point, and no severity 3+ notices on Carolina Gas Transmission in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Giant Cement Company (Carolina Gas Transmission loc 26223) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/carolina-gas-transmission/26223/