Tall Oak

Arkoma Connector Pipeline · Loc TOC · Oklahoma
Processing plant · counted in Supply / Production
Gas day Nov 26
0.033
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.033
Bcf/d
30-day average
0.057
30 of 30 days posted
30-day high
0.090
Nov 5
30-day low
0.033
Nov 26
Operating capacity
0.280
Bcf/d as posted, evening cycle
Utilization
12%
headroom 88%

Scheduled quantities as posted by Arkoma Connector Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.033+0.000
Nov 250.033+0.000
Nov 240.033-0.001
Nov 230.034+0.000
Nov 220.034+0.000
Nov 210.034+0.000
Nov 200.034-0.008
Nov 190.042+0.000
Nov 180.042-0.026
Nov 170.067-0.001
Nov 160.068+0.000
Nov 150.068+0.000
Nov 140.068+0.000
Nov 130.068-0.002
Nov 120.069-0.000
Nov 110.069-0.006
Nov 100.075+0.009
Nov 90.066+0.000
Nov 80.066+0.000
Nov 70.066-0.007
Nov 60.073-0.017
Nov 50.090+0.013
Nov 40.077+0.030
Nov 30.047-0.029
Nov 20.075+0.000
Nov 10.075+0.016
Oct 310.059+0.000
Oct 300.059+0.008
Oct 290.051+0.000
Oct 280.051—
53 more days on file for this meter, back to September 5, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Arkoma Connector Pipeline in the last 30 days.