Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Bobcat Storage (ANR interconnect) (injection, ANR Pipeline (TC Energy))

ANR Pipeline (TC Energy) · Loc 742883 · Gulf Coast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
-0.016
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 26
7-day average
-0.018
Bcf/d
30-day average
-0.015
30 of 30 days posted
30-day high
-0.000
Nov 25
30-day low
-0.045
Nov 22
Operating capacity
0.150
Bcf/d as posted, timely cycle
Utilization
11%
headroom 89%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

-0.060-0.040-0.0200.000Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.016-0.002
Nov 26-0.015-0.015
Nov 25-0.000+0.016
Nov 24-0.016-0.001
Nov 23-0.015+0.030
Nov 22-0.045-0.029
Nov 21-0.016-0.004
Nov 20-0.012+0.011
Nov 19-0.023-0.010
Nov 18-0.013-0.002
Nov 17-0.010+0.003
Nov 16-0.014+0.011
Nov 15-0.025-0.000
Nov 14-0.025-0.010
Nov 13-0.015+0.013
Nov 12-0.028+0.000
Nov 11-0.028-0.020
Nov 10-0.009+0.003
Nov 9-0.011+0.001
Nov 8-0.012-0.001
Nov 7-0.011-0.011
Nov 6-0.000+0.005
Nov 5-0.005+0.009
Nov 4-0.014-0.007
Nov 3-0.008+0.000
Nov 2-0.008+0.013
Nov 1-0.021-0.011
Oct 31-0.010+0.000
Oct 30-0.010-0.000
Oct 29-0.009—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR Pipeline

ANR PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Bobcat Storage (ANR interconnect) (injection, ANR Pipeline (TC Energy)) (ANR Pipeline (TC Energy) loc 742883) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/anr/742883/