Gas day Nov 27
0.120
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.146
Bcf/d
30-day average
0.112
30 of 30 days posted
30-day high
0.165
Nov 18
30-day low
0.000
Nov 4
Operating capacity
0.200
Bcf/d as posted, timely cycle
Utilization
60%
headroom 40%
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.120 | +0.000 |
| Nov 26 | 0.120 | -0.040 |
| Nov 25 | 0.160 | +0.000 |
| Nov 24 | 0.160 | +0.005 |
| Nov 23 | 0.155 | +0.000 |
| Nov 22 | 0.155 | +0.000 |
| Nov 21 | 0.155 | +0.005 |
| Nov 20 | 0.150 | -0.010 |
| Nov 19 | 0.160 | -0.005 |
| Nov 18 | 0.165 | +0.000 |
| Nov 17 | 0.165 | +0.000 |
| Nov 16 | 0.165 | +0.000 |
| Nov 15 | 0.165 | +0.000 |
| Nov 14 | 0.165 | +0.000 |
| Nov 13 | 0.165 | +0.000 |
| Nov 12 | 0.165 | +0.000 |
| Nov 11 | 0.165 | +0.000 |
| Nov 10 | 0.165 | +0.065 |
| Nov 9 | 0.100 | +0.000 |
| Nov 8 | 0.100 | +0.010 |
| Nov 7 | 0.090 | -0.030 |
| Nov 6 | 0.120 | +0.032 |
| Nov 5 | 0.088 | +0.088 |
| Nov 4 | 0.000 | +0.000 |
| Nov 3 | 0.000 | +0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | +0.000 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | -0.034 |
| Oct 29 | 0.034 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelinePlant location from EIA Form 860 (plant 55460).
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Power Generation meters on ANR Pipeline (TC Energy)
- COVERT POWER PLANT 0.184 Bcf/d
- TIFFANY EAST 0.170 Bcf/d
- ZEELAND INTERCONNECT 0.160 Bcf/d
- DETROIT EDISON GREENWOOD 0.089 Bcf/d
- WEAKLEY COUNTY INT 0.053 Bcf/d
- MINOOKA INTERCONNECT 0.051 Bcf/d
- BROWNSVILLE INTERCONNECT 0.030 Bcf/d
- HOLLAND BPW INT 0.021 Bcf/d
Cite thisEnercast PipeScrape, NILES PLANT (ANR Pipeline (TC Energy) loc 523098) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/anr/523098/