Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

LMBE North_A

Adelphia Gateway · Loc LMBEA · Northampton, PA
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.081
Bcf/d scheduled
Δ Day-over-day
+0.015
vs Nov 26
7-day average
0.079
Bcf/d
30-day average
0.075
30 of 30 days posted
30-day high
0.086
Nov 23
30-day low
0.051
Nov 6
Operating capacity
0.109
Bcf/d as posted, evening cycle
Utilization
74%
headroom 26%

Scheduled quantities as posted by Adelphia Gateway on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.081+0.015
Nov 260.066-0.015
Nov 250.081+0.000
Nov 240.081-0.005
Nov 230.086+0.010
Nov 220.075-0.009
Nov 210.084-0.001
Nov 200.086+0.003
Nov 190.083-0.003
Nov 180.086+0.000
Nov 170.086+0.000
Nov 160.086+0.002
Nov 150.084+0.003
Nov 140.081+0.000
Nov 130.081+0.000
Nov 120.081+0.000
Nov 110.081+0.000
Nov 100.081+0.000
Nov 90.081+0.000
Nov 80.081+0.000
Nov 70.081+0.030
Nov 60.051-0.012
Nov 50.062+0.002
Nov 40.060-0.003
Nov 30.064+0.013
Nov 20.051-0.003
Nov 10.053-0.013
Oct 310.066-0.009
Oct 300.075-0.002
Oct 290.077—
52 more days on file for this meter, back to September 7, 2026. Full meter-level history is part of Institutional (API and downloads).
LMBE North_A

Plant location from EIA Form 860 (plant 55667).

No recent notices matched or named this point, and no severity 3+ notices on Adelphia Gateway in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LMBE North_A (Adelphia Gateway loc LMBEA) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/adelphia-gateway/lmbea/