Natural Gas Pipeline Capacity Offline — Outage Calendar

Force majeure and planned/unplanned maintenance outages on all interstate pipelines. Volumes and start/end dates are derived directly from pipeline bulletin boards.

This page is updated daily. Pro subscribers get real-time updates.

Offline today · gas day Nov 27
0.030Bcf/d
unchanged from Nov 26
bullish 0.008bearish 0.022
Outages in effect
9
2 with a posted volume · 7 without (flow data suggests ~0.029 Bcf/d more, est.)
Next 7 days
2 ending · 1 starting
0.000 Bcf/d due back · starts have no posted volume · pipeline-posted dates
New capacity coming: 42.2 Bcf/d stated across 25 pipeline projects under construction, and 49.2 Bcf/d approved but not yet building. Next due: Bay Runner Pipeline (2.64 Bcf/d stated, 4Q26). Updated weekly. Pro subscribers get daily updates.
New Pipelines tracker →
New storage coming: 164.3 Bcf of working gas stated across 8 storage projects under construction, and 85.5 Bcf approved but not yet building. Next due: Gulf Coast Storage Expansion Project (NGPL) (10.0 Bcf stated, April 1, 2027). The website and free subscribers get updates weekly. Pro subscribers get them daily.
New Storage tracker →
New LNG export coming: 17.86 Bcf/d stated across 8 projects under construction, 4.45 Bcf/d commissioning, and 13.83 Bcf/d approved with no FID yet. Next due: Rio Grande LNG (Trains 1-5) (4.16 Bcf/d stated, T1-3 2027; T5 early 2031). The website and free subscribers get updates weekly. Pro subscribers get them daily.
New LNG Export tracker →

Today’s brief · gas day Nov 27

0.030 Bcf/d of pipeline capacity is offline on gas day Nov 27, unchanged from Nov 26. The largest are Sabine Pass Gillis station (0.022) and Tallgrass Energy Bertrand station (0.008). 7 more outages have no posted volume. Over the next 7 days, 2 outages are due back and 1 new outage is scheduled to start.

Largest outages now

  • Sabine Pass Gillis station0.022
    bearish · planned · until Dec 10
  • Tallgrass Energy Bertrand station0.008
    bullish · unplanned · no end date posted
  • Great Lakes Richfield~0.029 est.
    bullish · unplanned · until Dec 1
  • ANR UPDATED: CAPACITY REDUCTION Southwest Ma…no volume
    bullish · planned · until Dec 18
  • Colorado Interstate Gas Segment 164 Cheyenne Westno volume
    bearish · unplanned · until Dec 31
  • NEXUS Gas Transmission N1002 NEXUS DEO MR05 Meter Stationno volume
    bullish · unplanned · until Feb 16
  • +3 more in the calendar below

Since Nov 26

  • No new outages, returns or date changes.

Next 7 days (to Dec 4)

  • Great Lakes Richfield~0.029 est.
    Due back · posted end Dec 1
  • Nautilus Neptune Gas Plantno volume
    Due back · posted end Dec 2
  • Gulf Run Transmission Vernon CSno volume
    Starts · Dec 2 – Dec 3

Volumes are what the pipeline posted (or derived from a posted cap); “est.” marks an estimate from a drop in posted capacity. Dates are the pipeline’s own, not forecasts. Click any line for its notices.

Capacity offline by day

Quantified Bcf/d in effect each gas day, stacked by market side. Bars left of today are reconstructed from each event's posted window; dots mark what the ledger actually recorded that morning. Bars right of today are posted schedules, not forecasts.

Enercastenercast.com

Where capacity is offline

One marker per event in effect or scheduled, sized by Bcf/d and colored by market side; green rings are events lifted in the last seven days. Hollow markers are unquantified or ceiling-only. Markers sit at the compressor station, plant or terminal named in the notice where we have its location (HIFLD), otherwise on the pipeline’s line; dashed lines are schematic routes. Hover a marker for a summary and click it for the notices; hover a line to see the system, click it to filter the calendar.

Enercastenercast.com

Outage calendar

Click any bar for the event's notice chain and permalinks. Open-ended bars fade out at the right edge: the pipeline has not posted a return date.

Active (stated window) Active, until further notice Scheduled Lifted / expired Stale (no re-listing)
Enercastenercast.com
bullish bearish basis-only Due back (day after posted end)

In-effect detail

Every event currently in effect, with the figure's basis. Ceiling-only postings show the remaining capacity, never a reduction, and are not in any total.

About this data One bar per outage event, built from posted critical notices; stated, derived and estimated figures are labeled, and only stated or derived reductions are totaled. How Capacity Offline works → Capacity Offline FAQ →