Enercast — at the moment it matters
Enercast  /  New Storage  /  Tres Palacios Smith Cavern Expansion Project

Tres Palacios Smith Cavern Expansion Project

Tres Palacios Gas Storage LLC (Enbridge) · 24.8 Bcf working gas stated · Applied

Tres Palacios Smith Cavern Expansion Project is a storage cavern addition (salt cavern) by Tres Palacios Gas Storage LLC (Enbridge) in TX. It has an application pending and is not yet approved. Stated working gas added is 24.8 Bcf. In-service timing is stated as ratably 2028-2030. FERC docket CP26-556. Sources: FERC filings and the sponsor's public material. Last verified by Enercast on Nov 19, 2026.

StatusApplied
Working gas24.8 Bcf stated
three new caverns; Enbridge says ~25 Bcf, facility to ~64 Bcf; sanctioned (FID) May 2026
WithdrawalNot stated—
InjectionNot stated—
In-service timingratably 2028-2030 stated
OperatorTres Palacios Gas Storage LLC (Enbridge)
Project typeCavern addition
Storage typeSalt cavern
StatesTX
EIA storage regionSouth Central
JurisdictionInterstate (FERC-regulated) · FERC
FERC docketCP26-556
Last verifiedNov 19, 2026all sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.

Milestones

No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.

Change log

No changes since this project was first listed on Nov 17, 2026.

Sources

← All new storage projects