Tres Palacios Smith Cavern Expansion Project is a storage cavern addition (salt cavern) by Tres Palacios Gas Storage LLC (Enbridge) in TX. It has an application pending and is not yet approved. Stated working gas added is 24.8 Bcf. In-service timing is stated as ratably 2028-2030. FERC docket CP26-556. Sources: FERC filings and the sponsor's public material. Last verified by Enercast on Nov 19, 2026.
| Status | Applied | |
|---|---|---|
| Working gas | 24.8 Bcf stated three new caverns; Enbridge says ~25 Bcf, facility to ~64 Bcf; sanctioned (FID) May 2026 | |
| Withdrawal | Not stated | — |
| Injection | Not stated | — |
| In-service timing | ratably 2028-2030 stated | |
| Operator | Tres Palacios Gas Storage LLC (Enbridge) | |
| Project type | Cavern addition | |
| Storage type | Salt cavern | |
| States | TX | |
| EIA storage region | South Central | |
| Jurisdiction | Interstate (FERC-regulated) · FERC | |
| FERC docket | CP26-556 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- FERC, Jul 22, 2026: FERC eLibrary CP26-556 (application 2026-07-22)
- Company: Enbridge 2026-05