Texas Reliability Underground (TRU) Hub Phase 1 is a new natural gas storage facility (salt cavern) by NeuVentus, LLC in TX. It has been announced. Stated working gas added is 28 Bcf. Stated withdrawal capability added is 1.68 Bcf/d. In-service timing is stated as beginning in 2030. Sources: the sponsor's public material and trade press. Last verified by Enercast on Nov 19, 2026.
| Status | Announced | |
|---|---|---|
| Working gas | 28 Bcf stated three caverns (was two, 20 Bcf); RRC final order 2025 for up to 12 caverns, full build ~96 Bcf | |
| Withdrawal | 1.68 Bcf/d stated | |
| Injection | 0.84 Bcf/d stated | |
| In-service timing | beginning in 2030 company-stated | Company, read Nov 18, 2026 |
| Operator | NeuVentus, LLC | |
| Project type | New field | |
| Storage type | Salt cavern | |
| States | TX | |
| EIA storage region | South Central | |
| Jurisdiction | Intrastate · TX RRC | |
| State permit | TX RRC final order (2025) | Trade press, dated Apr 2, 2025 |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- Trade press, Apr 2, 2025: NeuVentus receives RRC storage permits for TRU Hub
- Company, Oct 13, 2026: NeuVentus/BusinessWire 2026-10-13
- Trade press: NGI 2026-10
- Trade press: BIC
- Company: NeuVentus: TRU Hub project page“TRU Hub is on schedule for phased in-service dates beginning in 2030.”