Pine Prairie Energy Center Phase IV Expansion is a storage cavern addition (salt cavern) by Pine Prairie Energy Center, LLC (Williams) in LA. It is approved but not yet under construction. Stated working gas added is 10.8 Bcf. Stated withdrawal capability added is 0.5 Bcf/d. FERC docket CP25-533. Sources: FERC filings, the Federal Register and the sponsor's public material. Last verified by Enercast on Nov 19, 2026.
| Status | Approved | |
|---|---|---|
| Working gas | 10.8 Bcf stated new Cavern 6, 10.8 Bcf working; certificate restated to 61.1 Bcf working / 87.2 total; Williams page says +10 Bcf | |
| Withdrawal | 0.5 Bcf/d stated | |
| Injection | 0.3 Bcf/d stated | |
| In-service timing | Not stated | — |
| Operator | Pine Prairie Energy Center, LLC (Williams) | |
| Project type | Cavern addition | |
| Storage type | Salt cavern | |
| States | LA | |
| EIA storage region | South Central | |
| Jurisdiction | Interstate (FERC-regulated) · FERC | |
| FERC docket | CP25-533 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- Federal Register, Nov 25, 2025: FR 2025-21029
- FERC, May 21, 2026: FERC eLibrary CP25-533 (order 2026-05-21)
- Company: Williams