Moss Bluff Storage Expansion is a storage cavern addition (salt cavern) by Moss Bluff Hub (Enbridge) in TX. It is approved but not yet under construction. Stated working gas added is 7 Bcf. In-service timing is stated as in stages from 2028 through 2033. Sources: the sponsor's public material and trade press.
No regulator filing yet. Enercast has no FERC docket, state permit or regulator document on file for this project. What is here comes from the sponsor or trade press.
| Status | Approved | |
|---|---|---|
| Working gas | 7 Bcf stated sanctioned Nov 2025 with Egan (23 Bcf combined) | |
| Withdrawal | Not stated | — |
| Injection | Not stated | — |
| In-service timing | in stages from 2028 through 2033 stated | |
| Operator | Moss Bluff Hub (Enbridge) | |
| Project type | Cavern addition | |
| Storage type | Salt cavern | |
| States | TX | |
| EIA storage region | South Central | |
| Jurisdiction | Intrastate · TX RRC | |
| Last verified | Not yet | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- Company: Enbridge 2025-11
- Trade press: P&GJ 2025-11