Enercast  /  New Storage  /  Mississippi Hub Expansion Project

Mississippi Hub Expansion Project

Mississippi Hub, LLC (Enstor) · 33.5 Bcf working gas stated · Under construction

Mississippi Hub Expansion Project is a storage cavern addition (salt cavern) by Mississippi Hub, LLC (Enstor) in MS. It is under construction. Stated working gas added is 33.5 Bcf. In-service timing is stated as 2028. FERC docket CP24-80. Sources: FERC filings, the sponsor's public material and trade press. Last verified by Enercast on Nov 19, 2026.

StatusUnder construction
Working gas33.5 Bcf stated
three ~10 Bcf caverns plus enlargement of existing caverns; facility to 56.3 Bcf
WithdrawalNot stated—
Injection0.7 Bcf/d stated
In-service timing2028 stated
OperatorMississippi Hub, LLC (Enstor)
Project typeCavern addition
Storage typeSalt cavern
StatesMS
EIA storage regionSouth Central
JurisdictionInterstate (FERC-regulated) · FERC
FERC docketCP24-80
Last verifiedNov 19, 2026all sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.

Milestones

No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.

Change log

No changes since this project was first listed on Nov 17, 2026.