Mississippi Hub Expansion Project is a storage cavern addition (salt cavern) by Mississippi Hub, LLC (Enstor) in MS. It is under construction. Stated working gas added is 33.5 Bcf. In-service timing is stated as 2028. FERC docket CP24-80. Sources: FERC filings, the sponsor's public material and trade press. Last verified by Enercast on Nov 19, 2026.
| Status | Under construction | |
|---|---|---|
| Working gas | 33.5 Bcf stated three ~10 Bcf caverns plus enlargement of existing caverns; facility to 56.3 Bcf | |
| Withdrawal | Not stated | — |
| Injection | 0.7 Bcf/d stated | |
| In-service timing | 2028 stated | |
| Operator | Mississippi Hub, LLC (Enstor) | |
| Project type | Cavern addition | |
| Storage type | Salt cavern | |
| States | MS | |
| EIA storage region | South Central | |
| Jurisdiction | Interstate (FERC-regulated) · FERC | |
| FERC docket | CP24-80 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- Company, Apr 15, 2025: Enstor/BusinessWire 2025-04-15
- FERC, Jul 23, 2026: FERC eLibrary CP24-80 (letter 2026-07-23)
- Trade press: OGJ