Midland storage pressure and capacity increase is a storage expansion (depleted reservoir) by Texas Gas Transmission, LLC (Boardwalk) in KY. It is approved but not yet under construction. Stated working gas added is 8.676 Bcf. FERC docket CP26-54. Sources: FERC filings, the Federal Register and EIA's storage field data. Last verified by Enercast on Nov 19, 2026.
| Status | Approved | |
|---|---|---|
| Working gas | 8.68 Bcf stated working gas inventory 65,182,677 Mcf -> 73,858,677 Mcf (EIA 2024 lists Midland at 65.18 Bcf, matching the starting figure) | |
| Withdrawal | Not stated | — |
| Injection | Not stated | — |
| In-service timing | Not stated | — |
| Operator | Texas Gas Transmission, LLC (Boardwalk) | |
| Project type | Expansion | |
| Storage type | Depleted reservoir | |
| States | KY | |
| EIA storage region | Midwest | |
| Jurisdiction | Interstate (FERC-regulated) · FERC (prior notice) | |
| FERC docket | CP26-54 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- Federal Register, Jan 6, 2026: FR 2026-00018 (2026-01-06)
- FERC: FERC eLibrary CP26-54
- EIA: EIA-191 field data 2024 (Midland 65.18 Bcf)