Majorsville-Heard Storage Complex abandonment is a storage field abandonment (depleted reservoir) by Columbia Gas Transmission, LLC (TC Energy) in WV, PA. It has an application pending and is not yet approved. Stated working gas removed is 34.8 Bcf. It is listed as a pending retirement and is not netted into the tracker's totals. FERC docket CP26-527. Sources: trade press and EIA's storage field data. Last verified by Enercast on Nov 19, 2026.
Pending retirement. This is an application to abandon whole storage fields. It is listed on New Storage but not netted into its totals: an inactive field is not formally retired until FERC approves the abandonment.
| Status | Applied | |
|---|---|---|
| Working gas | −34.8 Bcf stated EIA 2024 lists the three fields as INACTIVE with working gas Majorsville SH 3.3 + Majorsville DP 23.0 + Heard 8.5 = 34.8 Bcf and zero max delivery. Columbia's own figure not read. | |
| Withdrawal | 0 Bcf/d stated | |
| Injection | Not stated | — |
| In-service timing | Not stated | — |
| Operator | Columbia Gas Transmission, LLC (TC Energy) | |
| Project type | Retirement | |
| Storage type | Depleted reservoir | |
| States | WV, PA | |
| EIA storage region | East | |
| Jurisdiction | Interstate (FERC-regulated) · FERC | |
| FERC docket | CP26-527 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- Trade press: P&GJ 2026-09
- EIA: EIA-191 field data 2024 (NGQS RP7)