Magnum Gas Storage Project (2025 Amendment)

Magnum Gas Storage, LLC · 20.8 Bcf working gas stated · On hold

Magnum Gas Storage Project (2025 Amendment) is a new natural gas storage facility (salt cavern) by Magnum Gas Storage, LLC in UT. It is on hold. Stated working gas added is 20.8 Bcf. FERC dockets CP10-22, CP16-18, CP25-233. Sources: FERC filings and the Federal Register. Last verified by Enercast on Nov 19, 2026.

StatusOn hold
Working gas20.8 Bcf stated
four caverns of 5.2 Bcf; certificated since 2011, amended
WithdrawalNot stated—
InjectionNot stated—
In-service timingNot stated—
OperatorMagnum Gas Storage, LLC
Project typeNew field
Storage typeSalt cavern
StatesUT
EIA storage regionMountain
JurisdictionInterstate (FERC-regulated) · FERC
FERC docketCP10-22, CP16-18, CP25-233
Last verifiedNov 19, 2026all sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.

Milestones

No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.

Change log

No changes since this project was first listed on Nov 17, 2026.