Leaf River Expansion Project is a storage cavern addition (salt cavern) by Leaf River Energy Center LLC (NJR) in MS. It is under construction. Stated working gas added is 19.18 Bcf. FERC docket CP26-17. Sources: FERC filings, the Federal Register and trade press. Last verified by Enercast on Nov 19, 2026.
| Status | Under construction | |
|---|---|---|
| Working gas | 19.18 Bcf stated new Cavern 5 (12.52) + enlarge Caverns 2 and 4; facility 36.0 -> 55.18 Bcf per FERC order | |
| Withdrawal | Not stated | — |
| Injection | Not stated | — |
| In-service timing | Not stated | — |
| Operator | Leaf River Energy Center LLC (NJR) | |
| Project type | Cavern addition | |
| Storage type | Salt cavern | |
| States | MS | |
| EIA storage region | South Central | |
| Jurisdiction | Interstate (FERC-regulated) · FERC | |
| FERC docket | CP26-17 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- FERC, Jul 16, 2026: FERC eLibrary CP26-17 (order 2026-07-16; construction commenced 2026-10-12)
- Trade press: P&GJ 2026-07
- Federal Register: FR 2025-20186