LA Storage Hackberry Storage Project (Phase 1) is a new natural gas storage facility (salt cavern) by LA Storage, LLC (Sempra Infrastructure) in LA. It is under construction. Stated working gas added is 12.5 Bcf. In-service timing is stated as Q2 2027. FERC dockets CP21-44, CP24-487. Sources: FERC filings, the sponsor's public material and trade press. Last verified by Enercast on Nov 19, 2026.
| Status | Under construction | |
|---|---|---|
| Working gas | 12.5 Bcf stated three-cavern Phase 1; Phases 1+2 six caverns ~35 Bcf per RBN | |
| Withdrawal | Not stated | — |
| Injection | Not stated | — |
| In-service timing | Q2 2027 stated | |
| Operator | LA Storage, LLC (Sempra Infrastructure) | |
| Project type | New field | |
| Storage type | Salt cavern | |
| States | LA | |
| EIA storage region | South Central | |
| Jurisdiction | Interstate (FERC-regulated) · FERC | |
| FERC docket | CP21-44, CP24-487 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- FERC, Sep 19, 2024: FERC eLibrary CP24-487 (order 2024-09-19; construction 2024-11-21)
- Trade press: RBN 2026-11
- Company: Sempra fact sheet