Egan Cavern Expansion Project is a storage cavern addition (salt cavern) by Egan Hub Storage, LLC (Enbridge) in LA. It is approved but not yet under construction. Stated working gas added is 16 Bcf. In-service timing is stated as in stages from 2028 through 2033. FERC docket CP26-45. Sources: FERC filings, the Federal Register and the sponsor's public material. Last verified by Enercast on Nov 19, 2026.
| Status | Approved | |
|---|---|---|
| Working gas | 16 Bcf stated two caverns of 8.0 Bcf each | |
| Withdrawal | Not stated | — |
| Injection | Not stated | — |
| In-service timing | in stages from 2028 through 2033 stated | |
| Operator | Egan Hub Storage, LLC (Enbridge) | |
| Project type | Cavern addition | |
| Storage type | Salt cavern | |
| States | LA | |
| EIA storage region | South Central | |
| Jurisdiction | Interstate (FERC-regulated) · FERC | |
| FERC docket | CP26-45 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- FERC, Aug 13, 2026: FERC eLibrary CP26-45 (order 2026-08-13)
- Federal Register: FR 2026-04873
- Company: Enbridge 2025-11