East Cheyenne storage capacity reduction

East Cheyenne Gas Storage, LLC · −10 Bcf working gas stated · Applied

East Cheyenne storage capacity reduction is a storage capacity reduction (depleted reservoir) by East Cheyenne Gas Storage, LLC in CO. It has an application pending and is not yet approved. Stated working gas removed is 10 Bcf. Stated withdrawal capability removed is 0.14 Bcf/d. FERC docket CP25-95. Sources: FERC filings and the Federal Register. Last verified by Enercast on Nov 19, 2026.

Capacity reduction. This project lowers a facility’s stated capacity. Its figures are negative and are netted into the New Storage totals.

StatusApplied
Working gas−10 Bcf stated
working gas 22.5 -> 12.5 Bcf (base gas 15.7 -> 22.1)
Withdrawal−0.14 Bcf/d stated
InjectionNot stated—
In-service timingNot stated—
OperatorEast Cheyenne Gas Storage, LLC
Project typeCapacity reduction
Storage typeDepleted reservoir
StatesCO
EIA storage regionMountain
JurisdictionInterstate (FERC-regulated) · FERC
FERC docketCP25-95
Last verifiedNov 19, 2026all sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.

Milestones

No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.

Change log

No changes since this project was first listed on Nov 17, 2026.