D'Lo Gas Storage Project is a new natural gas storage facility (salt cavern) by D'Lo Gas Storage, LLC in MS. It has an application pending and is not yet approved. Stated working gas added is 24 Bcf. Stated withdrawal capability added is 1.2 Bcf/d. FERC docket CP27-20. Sources: FERC filings, the Federal Register and trade press. Last verified by Enercast on Nov 19, 2026.
| Status | Applied | |
|---|---|---|
| Working gas | 24 Bcf stated three caverns of 8 Bcf; withdrawal 1.2 Bcf/d, injection 0.59 Bcf/d (same design as the 2012/2018 certificate) | |
| Withdrawal | 1.2 Bcf/d stated | |
| Injection | 0.59 Bcf/d stated | |
| In-service timing | Not stated | — |
| Operator | D'Lo Gas Storage, LLC | |
| Project type | New field | |
| Storage type | Salt cavern | |
| States | MS | |
| EIA storage region | South Central | |
| Jurisdiction | Interstate (FERC-regulated) · FERC | |
| FERC docket | CP27-20 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
- Application filed with FERC stated
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- Federal Register, Aug 31, 2018: FR 2018-18914 (1.2 Bcf/d withdrawal, 0.59 injection)
- FERC, Nov 12, 2026: FERC eLibrary CP27-20 (application 2026-11-12)
- FERC, Nov 12, 2026: FERC eLibrary 20261112-5359 (CP27-20): Application/Petition/Request / Certificate of Public Convenience and Necessity
- Trade press, Nov 16, 2026: P&GJ 2026-11-16 'D'Lo 24-Bcf storage project seeks FERC certificate' (supplied by Ben)