Black Bayou Gas Storage Project (Phase 1, four caverns) is a new natural gas storage facility (salt cavern) by Black Bayou Gas Storage, LLC in LA. It is under construction. Stated working gas added is 44.4 Bcf. Stated withdrawal capability added is 2 Bcf/d. In-service timing is stated as late 2028. FERC dockets CP24-494, CP26-257. Sources: FERC filings and trade press. Last verified by Enercast on Nov 19, 2026.
| Status | Under construction | |
|---|---|---|
| Working gas | 44.4 Bcf stated 34.7 Bcf certificated 2025; CP26-257 amendment (order 2026-07-30) raised working gas per cavern; 44.4 Bcf per sponsor/NGI Nov 2026 | |
| Withdrawal | 2 Bcf/d stated | |
| Injection | 1.6 Bcf/d stated | |
| In-service timing | late 2028 stated | |
| Operator | Black Bayou Gas Storage, LLC | |
| Project type | New field | |
| Storage type | Salt cavern | |
| States | LA | |
| EIA storage region | South Central | |
| Jurisdiction | Interstate (FERC-regulated) · FERC | |
| FERC docket | CP24-494, CP26-257 | |
| Last verified | Nov 19, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.
Milestones
No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.
Change log
No changes since this project was first listed on Nov 17, 2026.
Sources
- FERC, Oct 20, 2026: FERC eLibrary CP24-494 (letter 2026-10-20)
- Trade press, Nov 16, 2026: Yahoo/Black Bayou 2026-11-16
- Trade press, Nov 17, 2026: NGI 2026-11-17
- Trade press: P&GJ 2025-10 (34.7 Bcf, 2.0/1.6 Bcf/d)