Black Bayou Gas Storage Project (Phase 1, four caverns)

Black Bayou Gas Storage, LLC · 44.4 Bcf working gas stated · Under construction

Black Bayou Gas Storage Project (Phase 1, four caverns) is a new natural gas storage facility (salt cavern) by Black Bayou Gas Storage, LLC in LA. It is under construction. Stated working gas added is 44.4 Bcf. Stated withdrawal capability added is 2 Bcf/d. In-service timing is stated as late 2028. FERC dockets CP24-494, CP26-257. Sources: FERC filings and trade press. Last verified by Enercast on Nov 19, 2026.

StatusUnder construction
Working gas44.4 Bcf stated
34.7 Bcf certificated 2025; CP26-257 amendment (order 2026-07-30) raised working gas per cavern; 44.4 Bcf per sponsor/NGI Nov 2026
Withdrawal2 Bcf/d stated
Injection1.6 Bcf/d stated
In-service timinglate 2028 stated
OperatorBlack Bayou Gas Storage, LLC
Project typeNew field
Storage typeSalt cavern
StatesLA
EIA storage regionSouth Central
JurisdictionInterstate (FERC-regulated) · FERC
FERC docketCP24-494, CP26-257
Last verifiedNov 19, 2026all sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Working gas, withdrawal and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly.

Milestones

No dated milestones recorded yet. They are added as FERC filings, orders and in-service notices appear.

Change log

No changes since this project was first listed on Nov 17, 2026.