Appalachia Supply Project is a natural gas pipeline expansion project by Columbia Gas Transmission, LLC (TC Energy). It is approved but not yet under construction. Stated capacity is 0.8 Bcf/d. In-service timing is stated as 2030. Source: the sponsor's public material. Last verified by Enercast on Nov 20, 2026.
| Status | Approved | Company, dated May 1, 2026 |
|---|---|---|
| Capacity | 0.8 Bcf/d stated Up to 0.8 Bcf/d stated; capable of up to 2.0 Bcf/d through future expansions (stated, not counted here). | Company, dated May 1, 2026 |
| In-service timing | 2030 company-stated | Company, dated May 1, 2026 |
| Operator | Columbia Gas Transmission, LLC (TC Energy) | Company, dated May 1, 2026 |
| Project type | Expansion | Company, dated May 1, 2026 |
| States | — | — |
| Length | — | — |
| Jurisdiction | Interstate (FERC-regulated) | Company, dated May 1, 2026 |
| Demand served | Electric (new gas-fired power generation) | Company, dated May 1, 2026 |
| Last verified | Nov 20, 2026 | all sources fetched |
Capacity and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page. Updated weekly. Pro subscribers get daily updates.
Where
Schematic: drawn along the whole Columbia Gas Transmission (TCO) system; the work may be on only part of it (Expansion of Columbia Gas Transmission (whole system drawn)). Places are approximate. All projects on the map.
Milestones
- Final investment decision stated
Change log
No changes since this project was first listed on Nov 20, 2026.
Sources
- Company: TC Energy Q1 2026 report (Form 6-K)“The project is designed to provide up to 0.8 Bcf/d of capacity to facilitate expanded new natural gas-fired power generation”