Natural Gas Pipeline Capacity Offline — Outage Calendar

Force majeure and planned/unplanned maintenance outages on all interstate pipelines. Volumes and start/end dates are derived directly from pipeline bulletin boards.

This page is updated daily. Pro subscribers get real-time updates.

Offline today · gas day Nov 19
0.799Bcf/d
down 0.077 from Nov 18
bullish 0.399bearish 0.400
Outages in effect
15
3 with a posted volume · 12 without (flow data suggests ~0.029 Bcf/d more, est.)
Next 7 days
4 ending · 0 starting
0.791 Bcf/d due back · pipeline-posted dates
New capacity coming: 41.4 Bcf/d stated across 24 pipeline projects under construction, and 41.1 Bcf/d approved but not yet building. Next due: Bay Runner Pipeline (2.64 Bcf/d stated, 4Q26). Updated weekly. Pro subscribers get daily updates.
New Pipelines tracker →
New storage coming: 164.3 Bcf of working gas stated across 8 storage projects under construction, and 85.5 Bcf approved but not yet building. Next due: Gulf Coast Storage Expansion Project (NGPL) (10.0 Bcf stated, April 1, 2027). Updated weekly.
New Storage tracker →

Today’s brief · gas day Nov 19

0.799 Bcf/d of pipeline capacity is offline on gas day Nov 19, down 0.077 from Nov 18. The largest are Sabine Pass Gillis station (0.400) and CGT Hampshire station (0.391). 12 more outages have no posted volume. Over the next 7 days, 4 outages are due back (0.791 Bcf/d posted) and nothing new is scheduled.

Largest outages now

  • Sabine Pass Gillis station0.400
    bearish · planned · until Nov 19
  • CGT Hampshire station0.391
    bullish · planned · until Nov 25
  • Tallgrass Energy Bertrand station0.008
    bullish · unplanned · no end date posted
  • Great Lakes Richfield~0.029 est.
    bullish · unplanned · until Dec 1
  • ANR UPDATED: CAPACITY REDUCTION Southwest Ma…no volume
    bullish · planned · until Dec 18
  • Colorado Interstate Gas Segment 164 Cheyenne Westno volume
    bearish · unplanned · until Dec 31
  • +9 more in the calendar below

Since Nov 18

  • El Paso Natural Gas Laguna CS0.077
    Dropped off · end date Nov 18 passed, no return notice
  • NEXUS Gas Transmission N1002 NEXUS DEO MR05 Meter Stationno volume
    New · until Feb 16
  • NGPL Station 168no volume
    New · until Dec 31
  • Transwestern West Texas Lateral CSno volume
    New · until Nov 21
  • Gas Transmission Northwest Kingsgate stationno volume
    Back in service · returned Nov 19
  • NGPL Amarillo 2 Mainlineno volume
    Back in service · returned Nov 18
  • +1 more — see the calendar

Next 7 days (to Nov 26)

  • Sabine Pass Gillis station0.400
    Due back · posted end Nov 19
  • Transwestern West Texas Lateral CSno volume
    Due back · posted end Nov 21
  • CGT Hampshire station0.391
    Due back · posted end Nov 25
  • TETCO Lebanon stationno volume
    Due back · posted end Nov 25

Volumes are what the pipeline posted (or derived from a posted cap); “est.” marks an estimate from a drop in posted capacity. Dates are the pipeline’s own, not forecasts. Click any line for its notices.

Capacity offline by day

Quantified Bcf/d in effect each gas day, stacked by market side. Bars left of today are reconstructed from each event's posted window; dots mark what the ledger actually recorded that morning. Bars right of today are posted schedules, not forecasts.

Enercastenercast.com

Where capacity is offline

One marker per event in effect or scheduled, sized by Bcf/d and colored by market side; green rings are events lifted in the last seven days. Hollow markers are unquantified or ceiling-only. Markers sit at the compressor station, plant or terminal named in the notice where we have its location (HIFLD), otherwise on the pipeline’s line; dashed lines are schematic routes. Hover a marker for a summary and click it for the notices; hover a line to see the system, click it to filter the calendar.

Enercastenercast.com

Outage calendar

Click any bar for the event's notice chain and permalinks. Open-ended bars fade out at the right edge: the pipeline has not posted a return date.

Active (stated window) Active, until further notice Scheduled Lifted / expired Stale (no re-listing)
Enercastenercast.com
bullish bearish basis-only Due back (day after posted end)

In-effect detail

Every event currently in effect, with the figure's basis. Ceiling-only postings show the remaining capacity, never a reduction, and are not in any total.

About this data One bar per outage event, built from posted critical notices; stated, derived and estimated figures are labeled, and only stated or derived reductions are totaled. How Capacity Offline works → Capacity Offline FAQ →