Enercast — at the moment it matters

[Transwestern Pipeline] [Capacity Constraint] WEST TEXAS LATERAL

SEV 4/5Force Majeure1 days
Summary
Transwestern Pipeline has declared force majeure on the West Texas Lateral effective Nov 15 2026 at 9:00 AM through Nov 16 2026 at 8:59 AM -- a roughly 24-hour window. No specific capacity volume is stated in the notice, and the POINT HISTORY for West Texas Lateral-named locations shows zero scheduled flow in the pre-event baseline, so no grounded net reduction can be derived. Despite the short duration and unquantified volume, force majeure classification on a Permian-outbound segment mandates minimum severity 4.
Trading note
TW force majeure on the West Texas Lateral cuts Permian-outbound capacity with no stated volume; expect bearish pressure at Waha as basin gas backs up and mild bullish pressure at SoCal Border/Arizona delivery points, though the zero pre-event baseline at named lateral meters suggests the physical impact may be near zero -- monitor for updated capacity figures.
Reroute potential
Moderate: EPNG serves overlapping Permian-to-SoCal/Arizona corridors and may absorb displaced volumes; however, if EPNG is simultaneously constrained, no California reroute exists.

Get alerts like this, free

Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate pipelines and scores each one for severity, capacity impact and basis direction. Free subscribers get Severity 4–5 notices by email or Telegram; Pro subscribers get every notice in real time.

View original notice text (as posted by Transwestern Pipeline)
Pipeline: Transwestern Pipeline
Notice ID: 121991
Notice Type: Capacity Constraint
Subject: WEST TEXAS LATERAL
Posted: Nov 14 2026 7:03PM
Effective: Nov 15 2026 9:00AM
End Date: Nov 16 2026 8:59AM

Notice Type Description: Capacity Constraint
Notice Identifier: 121991
Critical Notice Description: Critical notice
Posting Date/Time: Nov 14 2026 7:03PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: WEST TEXAS LATERAL
Notice Effective Date/Time: Nov 15 2026 9:00AM
Notice End Date/Time: Nov 16 2026 8:59AM
Reason: Force Majeure
Location: WEST TEXAS LATERAL
Cite this Enercast Pipe Monitor, “[Transwestern Pipeline] [Capacity Constraint] WEST TEXAS LATERAL” (Transwestern Pipeline), posted 2026-11-15. https://enercast.com/notice/transwestern-pipeline-tw-121991-r1.html
ID: TW-121991  |  Rev. 1  |  Posted: 2026-11-15 01:06  |  Direction: Bullish All Transwestern Pipeline notices  ·  page generated 2026-11-15 01:07 UTC