Enercast

CAPACITY REDUCTION: GTN – Flow Past Kingsgate (Posted: 8/24/26)

SEV 4/5Maintenance2.550 Bcf/d10 days
Summary
Gas Transmission Northwest (GTN) has declared an unplanned maintenance outage at Unit 5D affecting Flow Past Kingsgate (LOC #3500), effective 8/26 through 9/4/2026. Available capacity is reduced to 2,550 MMcf/d (2.550 Bcf/d) for the duration. GTN explicitly warns that Firm Primary, Firm Secondary, and Interruptible curtailments are anticipated, and the Reservation Charge Crediting Mechanism has been activated.
Trading note
GTN unplanned outage at Kingsgate restricts 2.550 Bcf/d of Western Canada/PNW corridor capacity through 9/4; with Firm Primary curtailments possible and GTN Kingsgate basis already deeply negative (most recently -1.710 vs HH as of 2026-08-21), expect the constraint to tighten PG&E Malin and downstream California basis materially over the 8/26-9/4 window.
Reroute potential
Limited: GTN is the primary Western Canada-to-Pacific Northwest corridor feeding California via Malin; Ruby Pipeline (monitored) and Northwest Pipeline (monitored) provide partial Rockies-origin alternatives but cannot replace WCSB volumes at equivalent scale, and simultaneous system stress on any of these pipes would further limit relief.

Get alerts like this, free

Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate pipelines and scores each one for severity, capacity impact and basis direction. Free subscribers get Severity 4–5 notices by email or Telegram; Pro subscribers get every notice in real time.

View original notice text (as posted by Gas Transmission Northwest)
TSP Name: Gas Transmission Northwest LLC
Notice ID: 1623
TSP: 006912885
Notice Type: Maint
Notice Status: Initiate
Posting Date/Time: 08/24/2026 14:10
Notice Eff Date: 08/24/2026
Notice Eff Time: 14:10
Notice End Date: 09/05/2026
Notice End Time: 08:59
Critical: Yes
Required Response: No response required

Subject: CAPACITY REDUCTION: GTN – Flow Past Kingsgate (Posted: 8/24/26)

Message Text:
Gas Transmission Northwest (GTN) is restricting capacity at Flow Past Kingsgate due to unplanned maintenance at Unit 5D. As a result, capacity will be reduced as follows: 8/26 – 9/4 Flow Past Kingsgate (LOC #3500): Available Capacity is 2,550 MMcf/d GTN anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. The Reservation Charge Crediting Mechanism of Section 5.1.3.10 shall apply to this outage. Please refer to the maintenance schedule for additional capacity impacts. Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 888-750-6275.
ID: 1623  |  Rev. 1  |  Posted: 2026-08-24 19:18  |  Direction: Bullish All Gas Transmission Northwest notices  ·  page generated 2026-09-26 06:43 UTC