Enercast

UPDATED: CAPACITY REDUCTION: GTN – Station 6 CFTP (Posted: 8/18/26)

SEV 4/5Capacity Constraint1.550 Bcf/d10 days
Summary
Gas Transmission Northwest has updated the capacity restriction at Station 6 CFTP (Loc #954690) associated with the Starbuck Outage and Bypass Installation, reducing available capacity to 1,550 MMcf/d (1.550 Bcf/d), down from the previously posted 1,600 MMcf/d. The restriction is in effect from 08/18/2026 through 08/29/2026 and GTN has flagged it as Critical with anticipated Firm Primary, Firm Secondary, and Interruptible curtailments. This is a first-time initiation notice (Revision 1, not a stale revision), reflecting an update to the capacity figure that accompanies the original outage posting.
Trading note
GTN Station 6 CFTP constraint at 1.550 Bcf/d through 08/29 with firm curtailment exposure; GTN Kingsgate basis has averaged -1.585 vs Henry Hub over the five trading days ended 2026-08-17 (most recently -1.565 on 2026-08-17), and further tightening of this Western Canada/PNW import corridor should pressure Kingsgate and PG&E Malin basis higher as downstream California supply diminishes.
Reroute potential
Limited: GTN is the primary Western Canada-to-Pacific Northwest corridor; Northwest Pipeline (NWP) provides partial Pacific Northwest alternative but does not fully replicate Canadian supply volumes into California, and Ruby Pipeline serves a different Rockies-to-Malin path that may absorb some displaced demand at premium.

Get alerts like this, free

Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate pipelines and scores each one for severity, capacity impact and basis direction. Free subscribers get Severity 4–5 notices by email or Telegram; Pro subscribers get every notice in real time.

View original notice text (as posted by Gas Transmission Northwest)
TSP Name: Gas Transmission Northwest LLC
Notice ID: 1618
TSP: 006912885
Notice Type: Maint
Notice Status: Initiate
Posting Date/Time: 08/18/2026 15:25
Notice Eff Date: 08/18/2026
Notice Eff Time: 15:25
Notice End Date: 08/29/2026
Notice End Time: 08:59
Critical: Yes
Required Response: No response required

Subject: UPDATED: CAPACITY REDUCTION: GTN – Station 6 CFTP (Posted: 8/18/26)

Message Text:
Effective immediately, GTN has updated the capacity impact of the Starbuck Outage and Bypass Installation from 1,600 MMcf/d to 1,550 MMcf/d. 8/19 – 8/28 Station 6 CFTP (LOC #954690) – Available Capacity 1,550 MMcf/d GTN anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. The Reservation Charge Crediting Mechanism of Section 5.1.3.10 shall apply to this outage. Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 888-750-6275.
ID: 1618  |  Rev. 1  |  Posted: 2026-08-18 20:32  |  Direction: Bullish All Gas Transmission Northwest notices  ·  page generated 2026-09-26 06:43 UTC