Enercast — at the moment it matters
Enercast  /  New Capacity  /  Wright Interconnect Project

Wright Interconnect Project

Iroquois Gas Transmission System, L.P. · 0.65 Bcf/d stated · Applied

Wright Interconnect Project is a natural gas pipeline expansion project by Iroquois Gas Transmission System, L.P. in NY. It has an application pending and is not yet approved. Stated capacity is 0.65 Bcf/d. In-service timing is listed by EIA as 2028. FERC docket CP13-502. Source: EIA's pipeline project tracker. Last verified by Enercast on Nov 10, 2026.

EIA only. So far the only source for this project is EIA’s pipeline project tracker, which lists a year, not a date, and can lag. Nothing here has yet been checked against a FERC filing or the sponsor.

StatusAppliedEIA, dated Aug 21, 2026
Capacity0.65 Bcf/d statedEIA, dated Aug 21, 2026
In-service timing2028 EIA-listed yearEIA, dated Aug 21, 2026
OperatorIroquois Gas Transmission System, L.P.EIA, dated Aug 21, 2026
Project typeExpansionEIA, dated Aug 21, 2026
StatesNYEIA, dated Aug 21, 2026
Length——
JurisdictionInterstate (FERC-regulated) · FERCEIA, dated Aug 21, 2026
FERC docketCP13-502EIA, dated Aug 21, 2026
Demand servedLDCEIA, dated Aug 21, 2026
Last verifiedNov 10, 2026all sources fetched

Capacity and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page.

Milestones

No dated milestones recorded yet. They are added as FERC orders, construction authorizations and in-service notices appear.

Change log

No changes since this project was first listed on Nov 10, 2026.

Sources

← All new capacity projects