Pipeline Modifications Project (Lake Charles LNG)

Trunkline Gas · 2.6 Bcf/d stated · Under construction

Pipeline Modifications Project (Lake Charles LNG) is a natural gas pipeline expansion project by Trunkline Gas in AR, MS, LA. It is under construction. Stated capacity is 2.6 Bcf/d. In-service timing is listed by EIA as 2031. FERC docket CP14-119. Source: EIA's pipeline project tracker. Last verified by Enercast on Nov 10, 2026.

EIA only. So far the only source for this project is EIA’s pipeline project tracker, which lists a year, not a date, and can lag. Nothing here has yet been checked against a FERC filing or the sponsor.

StatusUnder constructionEIA, dated Apr 27, 2026
Capacity2.6 Bcf/d statedEIA, dated Apr 27, 2026
In-service timing2031 EIA-listed yearEIA, dated Apr 27, 2026
OperatorTrunkline GasEIA, dated Apr 27, 2026
Project typeExpansionEIA, dated Apr 27, 2026
StatesAR, MS, LAEIA, dated Apr 27, 2026
Length17.89 milesEIA, dated Apr 27, 2026
JurisdictionInterstate (FERC-regulated) · FERCEIA, dated Apr 27, 2026
FERC docketCP14-119EIA, dated Apr 27, 2026
Demand servedLNGEIA, dated Apr 27, 2026
Last verifiedNov 10, 2026all sources fetched

Capacity and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page.

Milestones

No dated milestones recorded yet. They are added as FERC orders, construction authorizations and in-service notices appear.

Change log

No changes since this project was first listed on Nov 10, 2026.