Enercast — at the moment it matters
Enercast  /  New Capacity  /  Great Basin 2028 Expansion Project

Great Basin 2028 Expansion Project

Great Basin Gas Transmission · 0.948 Bcf/d stated · Pre-filing

Great Basin 2028 Expansion Project is a natural gas pipeline expansion project by Great Basin Gas Transmission in NV. It is in FERC's pre-filing process. Stated capacity is 0.948 Bcf/d. In-service timing is listed by EIA as 2028. FERC docket PF26-5. Source: EIA's pipeline project tracker. Last verified by Enercast on Nov 10, 2026.

EIA only. So far the only source for this project is EIA’s pipeline project tracker, which lists a year, not a date, and can lag. Nothing here has yet been checked against a FERC filing or the sponsor.

StatusPre-filingEIA, dated Sep 30, 2026
Capacity0.948 Bcf/d statedEIA, dated Sep 30, 2026
In-service timing2028 EIA-listed yearEIA, dated Sep 30, 2026
OperatorGreat Basin Gas TransmissionEIA, dated Sep 30, 2026
Project typeExpansionEIA, dated Sep 30, 2026
StatesNVEIA, dated Sep 30, 2026
Length207 milesEIA, dated Sep 30, 2026
JurisdictionInterstate (FERC-regulated) · FERCEIA, dated Sep 30, 2026
FERC docketPF26-5EIA, dated Sep 30, 2026
Last verifiedNov 10, 2026all sources fetched

Capacity and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page.

Milestones

No dated milestones recorded yet. They are added as FERC orders, construction authorizations and in-service notices appear.

Change log

No changes since this project was first listed on Nov 10, 2026.

Sources

← All new capacity projects