Dude Lateral Project

Double E Pipeline, LLC · 0.4 Bcf/d stated · Applied

Dude Lateral Project is a natural gas pipeline lateral project by Double E Pipeline, LLC in NM. It has an application pending and is not yet approved. Stated capacity is 0.4 Bcf/d. In-service timing is listed by EIA as 2026. FERC docket CP26-542. Source: EIA's pipeline project tracker. Last verified by Enercast on Nov 10, 2026.

EIA only. So far the only source for this project is EIA’s pipeline project tracker, which lists a year, not a date, and can lag. Nothing here has yet been checked against a FERC filing or the sponsor.

StatusAppliedEIA, dated Aug 21, 2026
Capacity0.4 Bcf/d statedEIA, dated Aug 21, 2026
In-service timing2026 EIA-listed yearEIA, dated Aug 21, 2026
OperatorDouble E Pipeline, LLCEIA, dated Aug 21, 2026
Project typeLateralEIA, dated Aug 21, 2026
StatesNMEIA, dated Aug 21, 2026
Length22.1 milesEIA, dated Aug 21, 2026
JurisdictionInterstate (FERC-regulated) · FERCEIA, dated Aug 21, 2026
FERC docketCP26-542EIA, dated Aug 21, 2026
Last verifiedNov 10, 2026all sources fetched

Capacity and in-service timing are what the source states. None is measured or forecast by Enercast. How to read this page.

Milestones

No dated milestones recorded yet. They are added as FERC orders, construction authorizations and in-service notices appear.

Change log

No changes since this project was first listed on Nov 10, 2026.