08/11/2026- Lebanon Compressor Station Unplanned Outage

SEV 4/5Compressor Issue0.424 Bcf/dUntil further notice
Summary
TETCO experienced an unplanned outage at its Lebanon, Ohio compressor station on August 11, 2026, reducing east-to-west nomination capacity to approximately 0.424 Bcf/d at Sarahsville, Summerfield, and Somerset, and 0.523 Bcf/d at Five Points and Lebanon, effective Gas Day August 12, 2026. Downstream operators west of Lebanon may see reduced pressures. No restoration timeline has been provided -- TE will post updates as they become available.
Trading note
Unplanned TETCO Lebanon CS outage restricts east-to-west capacity to 0.424 Bcf/d on key M-2 segment starting August 12; expect bullish pressure on TETCO M-3, which most recently traded at -0.480 vs HH (hub 2.230 vs HH 2.710 as of 2026-08-10), with potential further widening as reduced westbound flow tightens Mid-Atlantic supply; no restoration date adds a premium.
Reroute potential
Limited to moderate: Columbia Gas Transmission (TCO) and Equitrans serve overlapping Appalachian corridors and could absorb some displaced volumes, and Transco provides partial Mid-Atlantic alternative, but TETCO is a dominant Mid-Atlantic artery and a compressor constraint of this magnitude on the Ohio segment is difficult to fully offset at comparable cost.

Get alerts like this, free

Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate pipelines and scores each one for severity, capacity impact and basis direction. Free subscribers get Severity 4–5 notices by email or Telegram; Pro subscribers get every notice in real time.

View original notice text (as posted by Texas Eastern Transmission (TETCO))
TSP Name: Texas Eastern Transmission, LP
Subject: Lebanon Compressor Station Unplanned Outage
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 08/11/2026
Notice End Date: 11/09/2026
Posting Date: 08/11/2026
Notice Identifier: 181619
Required Response Indicator Description: No response required

Texas Eastern (TE) has experienced an unplanned outage at its Lebanon, Ohio compressor station (Lebanon) and efforts to restore this compressor station to full capacity are underway.  This outage results in a capacity for nominations flowing east to west through the stations below as follows:
Texas Eastern (TE) has experienced an unplanned outage at its Lebanon, Ohio compressor station (Lebanon) and efforts to restore this compressor station to full capacity are underway.  This outage results in a capacity for nominations flowing east to west through the stations below as follows:
Reduced to approximately
Reduced to approximately
Reduced to approximately
Sarahsville 424,000 Dth/d
Sarahsville 424,000 Dth/d
Sarahsville 424,000 Dth/d
Summerfield 424,000 Dth/d
Summerfield 424,000 Dth/d
Summerfield 424,000 Dth/d
Somerset 424,000 Dth/d
Somerset 424,000 Dth/d
Somerset 424,000 Dth/d
Five Points 523,000 Dth/d
Five Points 523,000 Dth/d
Five Points 523,000 Dth/d
Lebanon 523,000 Dth/d
Lebanon 523,000 Dth/d
Lebanon 523,000 Dth/d
Point operators located downstream of Lebanon compressor station may see lower than desired pressures.
Point operators located downstream of Lebanon compressor station may see lower than desired pressures.
Point operators located downstream of Lebanon compressor station may see lower than desired pressures.
Nominations for Gas Day August 11, 2026 will remain unaffected. However, nominations for Gas Day August 12, 2026 at the Sarahsville, Five Points and Lebanon compressor stations will be reduced to the capacities stated above.
Nominations for Gas Day August 11, 2026 will remain unaffected. However, nominations for Gas Day August 12, 2026 at the Sarahsville, Five Points and Lebanon compressor stations will be reduced to the capacities stated above.
Nominations for Gas Day August 11, 2026 will remain unaffected. However, nominations for Gas Day August 12, 2026 at the Sarahsville, Five Points and Lebanon compressor stations will be reduced to the capacities stated above.
TE will post further updates to the status of the repairs as soon as it is known.
TE will post further updates to the status of the repairs as soon as it is known.
TE will post further updates to the status of the repairs as soon as it is known.
Please contact your Operations Account Representative if you have any questions.
Please contact your Operations Account Representative if you have any questions.
Please contact your Operations Account Representative if you have any questions.
ID: TE-181619  |  Rev. 1  |  Posted: 2026-08-11 22:15  |  Direction: Bullish All Texas Eastern Transmission (TETCO) notices  ·  page generated 2026-09-26 06:43 UTC