Summary
Golden Pass Pipeline LLC has posted its Annual Planned Maintenance 2025-2026 Rev 36, covering planned outages on the Sabine Pass TX to Starks LA corridor serving up to 2.6 Bcf/d of LNG export feed gas capacity. This is filed as Revision Number 1 (first issuance), posted September 22, 2026. No specific per-job capacity impact figures or individual outage durations are stated in the notice text; the actual maintenance schedule details are not provided in the available text.
Trading note
Golden Pass Pipeline planned maintenance reduces LNG export feed gas availability on a system capable of up to 2.6 Bcf/d; absent per-job figures, impact is unquantified but any curtailment of Golden Pass feed gas keeps supply in the domestic market, bearish for Houston Ship Channel regional basis (most recently -0.410 vs Henry Hub as of 2026-09-21) and mildly bearish Henry Hub -- monitor GasNom EBB for per-job schedule and specific capacity restrictions.
Reroute potential
None: Golden Pass Pipeline is a dedicated LNG export feed gas lateral; gas not delivered to the terminal has no alternative export outlet on this system and remains in the domestic market.
Get alerts like this, free
Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate
pipelines and scores each one for severity, capacity impact and basis
direction. Free subscribers get Severity 4–5 notices by email or
Telegram; Pro subscribers get every notice in real time.
View original notice text (as posted by Golden Pass Pipeline)
[Planned Outage] Annual Planned Maintenance 2025- 2026 Rev 36 (posted September 22, 2026). Pipeline: Golden Pass Pipeline LLC (Sabine Pass TX → Starks LA). Capacity: up to 2.6 Bcf/d LNG export feed gas. This notice was posted on the Golden Pass Pipeline GasNom EBB under the 'Planned Outage' section.