Summary
Golden Pass Pipeline has posted its Annual Planned Maintenance 2025-2026 Rev 32, covering the Sabine Pass TX to Starks LA corridor with up to 2.6 Bcf/d of LNG export feed gas capacity at risk. This is listed as Revision Number 1 (not a revision of a prior posting), indicating a fresh or newly re-labeled filing as of September 15-16, 2026. No specific per-job schedule, individual outage dates, or discrete capacity impact figures are provided in the notice text; the 2.6 Bcf/d figure represents the system's full feed gas capacity ceiling, not a stated curtailment volume.
Trading note
Golden Pass Pipeline planned maintenance threatens feed gas deliveries to the Golden Pass LNG export terminal (up to 2.6 Bcf/d system capacity); any realized curtailment is bearish Gulf Coast basis as unexported gas stays domestic -- Houston Ship Channel regional basis has already softened to -0.455 vs Henry Hub as of 2026-09-15 (5-day average -0.287), and further feed gas disruptions would pressure that spread wider on the downside.
Reroute potential
None: Golden Pass Pipeline is a dedicated LNG export feed gas pipeline serving only the Golden Pass LNG terminal; curtailed feed gas volumes have no alternative export outlet and instead back into the Gulf Coast domestic market.
Get alerts like this, free
Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate
pipelines and scores each one for severity, capacity impact and basis
direction. Free subscribers get Severity 4–5 notices by email or
Telegram; Pro subscribers get every notice in real time.
View original notice text (as posted by Golden Pass Pipeline)
[Planned Outage] Annual Planned Maintenance 2025- 2026 Rev 32 (posted September 15, 2026). Pipeline: Golden Pass Pipeline LLC (Sabine Pass TX → Starks LA). Capacity: up to 2.6 Bcf/d LNG export feed gas. This notice was posted on the Golden Pass Pipeline GasNom EBB under the 'Planned Outage' section.