Enercast

Annual Planned Maintenance 2025- 2026 Rev 31

SEV 4/5Maintenance2.600 Bcf/dUntil further notice
Summary
Golden Pass Pipeline has posted its Annual Planned Maintenance notice for 2025-2026 (Rev 31), covering up to 2.6 Bcf/d of LNG export feed gas capacity on the Sabine Pass TX to Starks LA corridor. This is a planned outage notice filed under the GasNom EBB; specific maintenance windows and curtailment depths within the 2.6 Bcf/d ceiling are not detailed in this posting. Golden Pass Pipeline is an LNG export terminal feed gas system, triggering the LNG feedgas severity floor regardless of the planned nature of the event.
Trading note
Planned maintenance on Golden Pass Pipeline threatens up to 2.6 Bcf/d of LNG export feed gas capacity; gas displaced from export remains in the domestic market, applying bearish pressure at Gulf Coast points -- the Houston Ship Channel regional proxy basis averaged -0.347 vs Henry Hub over the five trading days ended 2026-08-11, most recently -0.420 on 2026-08-11, and further widening is possible on days when feed gas nominations are curtailed.
Reroute potential
None: LNG export feed gas displaced by maintenance cannot be rerouted to an alternative export terminal -- curtailed volumes remain in the domestic pipeline system and pressure Gulf Coast supply balances.

Get alerts like this, free

Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate pipelines and scores each one for severity, capacity impact and basis direction. Free subscribers get Severity 4–5 notices by email or Telegram; Pro subscribers get every notice in real time.

View original notice text (as posted by Golden Pass Pipeline)
[Planned Outage] Annual Planned Maintenance 2025- 2026 Rev 31 (posted August 12, 2026). Pipeline: Golden Pass Pipeline LLC (Sabine Pass TX → Starks LA). Capacity: up to 2.6 Bcf/d LNG export feed gas. This notice was posted on the Golden Pass Pipeline GasNom EBB under the 'Planned Outage' section.
ID: Planned Maintenance 2025-2026 - Rev 311  |  Rev. 1  |  Posted: 2026-08-12 19:35  |  Direction: Bearish All Golden Pass Pipeline notices  ·  page generated 2026-09-26 06:43 UTC