Enercast

CAPACITY REDUCTION Southwest Area

SEV 4/5Maintenance0.480 Bcf/d6 days
Summary
ANR Pipeline has posted a planned maintenance outage at the Wheeler Hidetown meter station (Loc #523099) in Wheeler County, Texas, scheduled September 13-18, 2026 (6 days). Capacity at this location will be reduced from 480 MMcf/d to zero, with ANR explicitly warning of 100% curtailments to Firm Primary service based on both current nominations and contracted MDQ. This is a full capacity elimination at a Southwest Area receipt/delivery point affecting all service classes.
Trading note
ANR Wheeler Hidetown maintenance removes 0.480 Bcf/d of Southwest Area capacity on September 13-18, with 100% Firm Primary curtailments anticipated; expect tightening at ANR ML 7 (Michigan/Wisconsin) delivery basis and modest bearish pressure at Gulf Coast receipt points as northbound takeaway is reduced, with any unaffected competing pipes (TETCO, TGC) as partial mitigation.
Reroute potential
Moderate: TETCO (monitored), Trunkline/TGC (monitored), and Southern Star (monitored) serve overlapping Gulf Coast-to-Midwest corridors and may absorb displaced volumes, but the 0.480 Bcf/d full curtailment with advance notice gives shippers time to arrange alternatives before the September 13 effective date.

Get alerts like this, free

Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate pipelines and scores each one for severity, capacity impact and basis direction. Free subscribers get Severity 4–5 notices by email or Telegram; Pro subscribers get every notice in real time.

View original notice text (as posted by ANR Pipeline (TC Energy))
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage

Notice Stat Desc: Initiate

Prior Notice: 

Critical: Y

Reqrd Rsp Desc: No Response Required
Post

Notice Effective

Notice End



Response
Post Date: 08/24/26

08/24/26

09/19/26
Subject: Subject: CAPACITY REDUCTION Southwest Area
Author: Author: T0000106
Notice Text
ANR has planned maintenance in the Southwest Area at the Wheeler Hidetown meter station located in Wheeler County, Texas. As a result, capacity will be reduced as follows:

 

9/13 – 9/18 Wheeler Hidetown (LOC #523099): 480 MMcf/d (leaving 0 MMcf/d)

 

ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:

100% - Based on the Current Net Shipper Nominations

             100% - Based on the Current Contracted MDQ

            

Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage.  In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.

Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267.
ID: ANR-26155054  |  Rev. 1  |  Posted: 2026-08-24 20:32  |  Direction: Bullish All ANR Pipeline (TC Energy) notices  ·  page generated 2026-09-26 06:43 UTC