CTPL 2026 Planned Outage and Maintenance Summary – Updated 10.15.26

SEV 4/5Maintenance0.400 Bcf/d cut (capped at 1.530 Bcf/d)6 days
Summary
CTPL 2026 Q4 maintenance summary (updated 10/15/26) bundles two jobs at Gillis Compressor Station. The highest-impact job is Job 2026115, a 6-day Station Upgrade (11/12-11/18/2026) that reduces available capacity to zero transport impact (0 Dths transport impact) with available capacity of 1,530,000 Dths and a TETCO (CT109413) meter capacity limit set to 0, effectively cutting one feed interconnect entirely. The lesser job, 2026114, is a 15-hour compressor maintenance event (11/17/2026) with a 400,000 Dth/day transport impact and 1,130,000 Dths available capacity.
Trading note
Job 2026115 Station Upgrade at Gillis Compressor Station (11/12-11/18, 6 days) sets TETCO CT109413 meter limit to zero and posts zero transport impact Dths with 1.530 Bcf/d available capacity, reducing feedgas flexibility at Sabine Pass LNG and applying bearish pressure on Henry Hub as export throughput is constrained during the upgrade window.
Reroute potential
None: Sabine Pass LNG is the delivery endpoint; no alternative pipeline can substitute for LNG feedgas curtailed at the Gillis terminal interconnect during the station upgrade.

Get alerts like this, free

Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate pipelines and scores each one for severity, capacity impact and basis direction. Free subscribers get Severity 4–5 notices by email or Telegram; Pro subscribers get every notice in real time.

View original notice text (as posted by Sabine Pass LNG)
Facility: Sabine Pass LNG
Notice ID: 2006
Notice Type: Planned Service Outage
Status: Revision / Supersedes Prior Notice
Title: CTPL 2026 Planned Outage and Maintenance Summary – Updated 10.15.26
Effective Date/Time: 2026-10-15T08:38:00
End Date/Time: 2026-11-30T00:00:00
Posted: 2026-10-15T08:40:23.447
Note: Effective/End Date above is the posting's overall coverage window, NOT necessarily one continuous outage -- see Notice Text and/or the embedded image below for the actual per-job schedule.

Notice Text:
Below is a summary of the CTPL 2026 Planned Outage and Maintenance Projects.   Items marked with * denotes updates from previous posting.   This notice reflects current information as of October 15, 2026. This summary is subject to change as the year progresses to reflect the updated status of all planned outages and maintenance projects. CTPL will post updates as they become available. If you have any questions, please contact Customer Services at 713-375-5900 or email Cheniere.CTPL@Cheniere.com .

[EMBEDDED_IMAGE: notice_images/00002006_1.png]
The image above contains this notice's detailed schedule table (fields commonly include Job No., Begin/End dates, Location, Maintenance type, Transport Impact, Available Capacity, and Meter Capacity Limit). This table is NOT present anywhere in this notice as text -- Cheniere delivers it as a picture to every visitor of the page, not just to automated scrapers. Do not treat the Effective/End Date range above as a single continuous outage window: a 'Planned Outage and Maintenance Summary' notice like this one commonly bundles several independent jobs with different dates, locations, and impacts (including some with zero transport impact) into one posting. Read the table in the image directly for accurate per-job dates and capacity figures rather than inferring them from the date range alone.
This notice supersedes a prior filing. Treat as a revision; check for escalation triggers vs prior notice.